Petroleum Contaminated
Soil Removal

AECS was retained to perform the excavation and off-site disposal of petroleum-contaminated soils at a former fueling facility.

Scope of Work

  • Pre-excavation soil sampling to delineate contamination boundaries
  • Mobilization of heavy equipment and environmental field personnel
  • Careful excavation and segregation of contaminated soil from clean material
  • Stockpile management and dust/vapor suppression controls
  • Manifesting, transportation, and off-site disposal at a licensed facility
  • Confirmation sampling to verify cleanup standards were achieved
  • Site backfill, compaction, and surface restoration
  • Preparation of closure documentation submitted to Georgia EPD

Results

All petroleum-impacted soils were successfully removed and disposed of. Confirmation sampling demonstrated that cleanup standards were met and the project received regulatory closure from Georgia EPD.