AECS performed the excavation and off-site disposal of soils contaminated with polychlorinated biphenyls (PCBs) at a former industrial facility. The project was regulated under TSCA (Toxic Substances Control Act) and required coordination with EPA Region 4 throughout the remediation process.
Scope of Work
- Review of existing site investigation data to plan excavation boundaries
- Preparation of a TSCA-compliant Remediation Waste Management Plan
- Excavation of PCB-impacted soils using appropriate engineering controls
- Segregation of TSCA-regulated waste from non-regulated material to minimize disposal costs
- Stockpile sampling to confirm waste classification and disposal pathway
- Coordination with EPA-approved TSCA disposal facility for waste acceptance and profiling
- Manifesting under TSCA regulations with proper EPA waste codes
- Confirmation sampling of excavation walls and floor to verify cleanup levels
- Backfill, compaction, and site restoration
Results
All PCB-contaminated soils exceeding cleanup standards were successfully excavated and disposed of at a TSCA-permitted facility. Confirmation sampling verified that residual PCB concentrations in the excavation met applicable cleanup levels, and the project received regulatory closure from EPA.